GORDA AREA, Monterey County — October 28, 2026. Drivers using Highway 1 on the remote South Coast should plan for potential delays near Buck Creek Bridge. The Transportation Agency for Monterey County’s weekly traffic report lists one-way traffic control between Buck Creek Bridge and South Coast Center during October 26–30, 2026, for drainage-related work.

What does the countywide traffic report say?

In the report covering October 25–31, the transportation agency lists one-way controls along northbound and southbound Highway 1 from Buck Creek Bridge toward South Coast Center, generally 7 a.m. to 7 p.m. It estimates possible delays of about 10 minutes. Those are the published work-window and delay estimates; they do not verify that a traffic flagger is at a particular point at this moment.

Why this matters near Gorda

For South Coast residents and travelers, Highway 1 is a key connection to coastal communities and services. Roadside drainage and slope conditions are especially important in a corridor affected by past storm and wildfire damage. Detours on minor roads are often unavailable or unsuitable, so motorists should check the responsible agency’s current information before setting out.

Is this the same Mud Creek project?

No. The Buck Creek Bridge–South Coast Center drainage work is listed as a separate location and work period from the Mud Creek emergency roadwork scheduled through November 13. California58 has previously reported the Mud Creek restrictions and is not republishing that event here.

Are residents under an evacuation order?

This particular traffic report describes roadwork, not an evacuation order. Any wildfire evacuation or emergency closure should be verified independently with public-safety officials and Caltrans. Maps and mobile service can be unreliable in isolated coastal stretches.

Official sources: Transportation Agency for Monterey County — October 25–31 Cone Zone Report and Caltrans current highway conditions. This is a road-access bulletin, not confirmation that the project is complete or that Highway 1 is entirely open.

YOUR LOCAL NEWSPAPER NEEDS YOU

Help this community newspaper grow

Your support helps build coverage for the people and places this local newspaper serves.

Donate once by card ↗
Help Gorda News grow Help strengthen reporting on Gorda: community voices, important decisions and local life.
Support Gorda News

Choose how to support Gorda News:

Credit / Debit Card via Stripe

Choose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Gorda News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.
Optional support through the publisher. Contributions are not advertised as tax-deductible and never buy editorial influence.

Gorda News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Gorda News newsroom →

More from Gorda News

Explore more local reporting and community updates on the newspaper homepage.

Visit Gorda News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.